The Result
To aid in achieving uniformity of colour and finish Roadstone tested the consistency of each load of concrete prior to dispatch to site and maintained close communication with site engineers for the duration of the project.
Completed in separate pours over a six-month period, over 20 loads of architectural concrete were supplied to DCU Hub. As well as meeting the demands of an architectural finish the concrete also met structural and durability requirements.