Cover all fresh work at night from rain and frost. Fill/compact all vertical joints. Use 6”(150mm) vertical D.P.C (Damp proof course) at windows and doors. Use stepped D.P.C over all windows and doors in accordance with good building practice. Never use cavity fill insulation Never use expanded metal for wall ties. Control joints usually 6m centres (10mm wide).